Jane tried her kitchen in teal and granite in the AI Showroom first, then settled on white Shaker with a navy island — and that is the design drawn up in 2020 Design. Same room, same angle, so every pro quoting the work sees exactly what she’s after.
Each request Jane makes on the site drops into this proposal as its own chapter. Open any one for the full specification — right down to the handles — and the local pro who’ll quote it.
Their quoteAwaiting
A bright, refined take on Jane’s kitchen: crisp white Shaker cabinetry, a navy island under white marble, brass pulls and polished-chrome tapware.
Quote received$38,000
Frameless custom cabinetry in painted white with a navy island and brushed-brass pulls, soft-close throughout, built to Jane’s measurements.
Quote received$9,200
A soft white marble-look stone with grey veining across the perimeter and the two-tier island, honed and undermount-sinked.
Their quoteAwaiting
Wide-plank engineered natural oak in a matte finish, laid to flow into the adjoining rooms.
Quote received$22,500
A coordinated, integrated appliance package — each piece specified to type, size, brand and finish. Open the spec for the full schedule.
Their quoteAwaiting
The working hardware — polished-chrome tapware, faucets and undermount sinks that finish the room.
Their quoteAwaiting
The pieces that make the kitchen livable — island seating and a dining set, in tones that pick up the cabinetry and stone.
Their quoteAwaiting
Three matte-black cone pendants over the island, with task, ambient and in-cabinet accent lighting on separate controls.
Their quoteAwaiting
Rough-ins set to the new layout with a pot filler at the range, pressure-tested before close-up.
Their quoteAwaiting
One team keeping the trades sequenced, the site clean and the schedule on track.
Figures shown are working placeholder estimates. Final pricing is confirmed with each partner after Total Spaces Décor reviews the proposal.
This total builds itself. As each pro returns their quote, its price drops in here and the number climbs. Right now 3 of 10 quotes are in — the rest are still out.
Live total — reflects only the quotes received so far. It updates automatically as the remaining 7 come in.
Jane’s design has been produced as a full 360° walk-through — the same kitchen shown on every page of this proposal, turned into an immersive view she can open in any browser or on her phone. Look up at the pendants, down at the floor, all the way around the island. It’s the closest thing to standing in the finished kitchen before the first cabinet is hung.
Jane’s floor plan and six dimensioned elevations, with cabinet codes, as produced for the 360° design. These are the drawings each trade quotes from.
13Seven stages take Jane’s kitchen from this proposal to a finished room. Each stage ends with one sign-off, so nothing is ordered, built or paid for without her approval. Dates are approximate and are confirmed with each partner as quotes come in; construction is planned to start Monday, March 1, 2027.
| Stage | When | What you sign | |
|---|---|---|---|
| 1 | Design approvalThe 360° design, floor plan and elevations. | Sept 2026 | Design sign-off — layout, finishes and the plan set locked HomeownerDate |
| 2 | Quotes & selectionsAll ten trade quotes returned; final product selections. | Oct – Nov 2026 | Selections & budget approval — the project costing (11) HomeownerDate |
| 3 | Agreements & depositsContracts with each partner; deposits placed. | Nov 2026 | Trade agreements and deposit schedule HomeownerDate |
| 4 | Ordering & permitsCabinets ordered (8–10 week lead), appliances reserved, permit filed. | Dec 2026 – Jan 2027 | Cabinet shop drawings; appliance schedule; permit application HomeownerDate |
| 5 | Pre-constructionSite walkthrough, protection plan, schedule confirmed. | Feb 2027 | Construction schedule and site-readiness checklist HomeownerDate |
| 6 | ConstructionDemolition through finish, sequenced by the general contractor (calendar below). | Mar 1 – May 27, 2027 | Progress sign-offs at rough-in, cabinet install and countertop install HomeownerDate |
| 7 | CompletionFinal walkthrough, deficiencies cleared, warranties handed over. | May 28, 2027 | Completion certificate; holdback release HomeownerDate |
Working days are colour-coded by phase. Weekends and statutory holidays are left clear; the general contractor confirms the exact sequence once the cabinet delivery date is set.
| Demolition & disposal | Mar 1 – Mar 5 |
| Rough-in plumbing & electrical | Mar 8 – Mar 19 |
| Rough-in inspections | Mar 22 – Mar 23 |
| Drywall, prime & paint | Mar 24 – Apr 6 |
| Flooring | Apr 7 – Apr 13 |
| Cabinet installation | Apr 14 – Apr 23 |
| Countertop template & fabrication | Apr 26 – May 7 |
| Countertop install | May 10 – May 11 |
| Finish plumbing, electrical & backsplash | May 12 – May 19 |
| Appliances & fixtures | May 20 – May 21 |
| Deficiencies & clean | May 25 – May 27 |
| Final walkthrough & sign-off | May 28 |